The Site

  •  Self-contained, fully fenced and secure site
  • Security hut
  • Close proximity to Heathrow Airport and the M25 motorway
  • Attractively landscaped
  • 110 on site car parking spaces available

The building

Cargo 777 is a modern headquarters warehouse/industrial  building, constructed in 2006 to the following high  quality specification, detailed below.


Specification

Warehouse

  • 8.5m minimum clear height rising to 11.3m to apex
  • 4 dock level loading doors
  • 3 ground level loading doors
  • 50kN/m2 floor loading
  • B1c, B2 and B8 unrestricted use
  • Floodlit and gated yard
  • Fire/smoke screen and vents
  • Approximately 7,200 pallet positions
  • EPC – to follow post refurbishment

Offices

  • Fully air conditioned
  • Suspended ceiling with metal ceiling tiles
  • Full access raised floors
  • Double height reception
  • 2.85m floor to ceiling height
  • Eight person passenger lift

Accommodation

Accommodation Sq Ft Sq M
Warehouse 62,410 5,798
Offices 18,094 1,681
Security Hat 288 27
Total 80,792 7,506

Measured on a GEA basis.